Access and scheduling
Public libraries are busiest in June and July, when summer reading programs fill the children’s room, so most branches move in the fall or right after the winter holidays. Many keep a book drop or pop-up service open elsewhere while the branch is closed, and we can move the returns bin last.
Shelving is usually the pacing item. If new shelving is going in at the destination, the shelving installer needs to finish before the first cart arrives, because books have nowhere to go on a half-built range. If existing shelving moves with the collection, we take ranges down behind the books and rebuild them ahead of the next load. A public-owned building may ask for our insurance certificate before we start, which we can provide.

