Skip to main content
Retail, Restaurant & Hospitality

Bar and Brewery Moving in Jacksonville and St. Johns County

The draft tech pulls the tap system, the brewhouse installer handles the tanks, and the licensee moves the alcohol. We move the bar and taproom around them.

(904) 209-9277
Bar & Brewery moving in St. Johns County and Jacksonville: moving crew at work
  • Licensed & Insured Fully Covered
  • Owner-Operated By Devin Vangel
  • Northeast Florida St. Johns + Duval + Beyond

Start your free bar & brewery move quote

verified For estimate purposes only credit_card_off No credit card required

Planning a Bar & Brewery Move

Behind any bar there are three kinds of property, and each has its own owner on move day. The furniture and fixtures are yours to move, and that’s our part: back-bar cabinets, freestanding bottle shelving, high-tops, stools, and the patio set. The draft system is its own trade: tap towers, glycol chillers, and the trunk lines running back to the cooler. A draft technician takes those down and puts them back up. In a brewery, the brewhouse, fermenters, and brite tanks go to the installer who set them.

Then there’s the alcohol. Full kegs, cased beer, wine, and spirits are the licensee’s responsibility, and the licensee moves them under its own license, keeping them out of our truck. Empty kegs usually belong to the brewery or distributor that filled them, so your staff sort returns from anything that really belongs to you. Once all that is separated, the bar we move is empty, dry, and ready to set by your new floor plan.

Who usually signs off
Bar owner, brewery owner, or taproom general manager, who holds the schedule for the draft, brewhouse, and alcohol handoffs
Timing that works
After last call on the final night, with the draft tech and brewhouse installer booked around the carry and a second date held in late summer

What typically moves

  • Freestanding back-bar cabinets and bottle shelving Emptied by the bartenders, shelves pinned or pulled, and every cabinet marked for its place on the new bar drawing.
  • Bar stools, high-tops, and taproom benches Grouped by area: rail, floor, patio, private room. Each group rides and unloads together.
  • Glassware by style Pints, tulips, snifters, and rocks glasses packed in cell cartons and sorted by glass, so restocking the new rail goes quickly.
  • Bar mats, speed rails, and tools Washed, dried, and boxed per well so each bartender station unpacks from its own carton.
  • Patio furniture and umbrellas Umbrellas come down and sleeve up; tables and chairs are wiped dry before loading so sand and water stay off the truck.
  • Merch racks and the taproom’s retail shelf Stock boxed by your staff; the fixture is padded and set by the door the same as before.

Access and scheduling

The move can’t start until the bar stops pouring. On the final night, bartenders empty the wells, the licensee pulls the alcohol inventory, and the draft tech drains and disconnects the lines. We start carrying once the back-bar is empty and the draft work is out of the way, which usually means a late evening or the next morning.

Jacksonville Beach bars off A1A tend to load from a short alley shared with the next business, and parking there fills early on weekends. Riverside and St. Augustine taprooms often sit in older buildings with narrow rear doors and a step down to the sidewalk. We measure every door on both ends before booking the truck. A tropical system can shut the Beaches for a day at the height of the season, so late-summer bookings carry a spare date.

Protection and handling

Bar tops and back-bar faces are usually the most expensive finish in the room, so they’re blanketed and shrink-wrapped before anything moves near them, and cabinet corners get guards before they pass a door frame. Mirrored back panels ride upright in padded crates or cartons, not laid flat.

Wet is the other enemy. A bar floor stays damp after a final shift, so we mop and runner the path before rolling carts. Coolers must be empty and dried before their shelving comes out, and patio pieces are wiped down so sand and salt don’t grind into another piece in the truck. At the new bar, glassware goes straight to the back-bar it belongs to, not a pile in the stockroom.

Who does what

Some of this job belongs to other trades. The written plan names each one.

Tap towers, the glycol unit, trunk lines, and keg couplers
A draft-system technician drains, disconnects, and reinstalls the draft system, then cleans and balances the lines before the first pour.
Brewhouse, fermenters, brite tanks, and glycol plumbing
The brewhouse installer or equipment vendor plans the removal, transport, and startup; heavy tank moves need their riggers, not our crew.
Full kegs, cases, and bottled stock
Transport of every alcohol product is handled by the licensee under its license, with its own records; distributor-owned empties go back through the distributor.

Not part of our work

  • Carrying full kegs, cases, or bottles of any alcohol.
  • Disconnecting draft lines, glycol, water, gas, or refrigerant, or moving installed walk-in coolers.
  • Moving brewhouse vessels or any tank that needs rigging.

Around St. Johns County and Jacksonville

First Coast bars and taprooms cluster along A1A in Jacksonville Beach, Neptune Beach, and Atlantic Beach, in Riverside and San Marco, and around St. Augustine’s historic district, where some blocks are pedestrian-only and loading windows are short. Spring break, the tourist season, and summer weekends are the busiest stretch for all of them.

The crew that shows up

Happy 2 Help Moving crew lead in a black company poloHappy 2 Help Moving box truck with the company logo

Bar & Brewery Moving FAQs

Another question? Call (904) 209-9277.

Can your crew take the full kegs when the back-bar goes?

No. Full kegs and every other alcohol product stay with the licensee, who moves them under the license. Have your staff separate full kegs, distributor empties, and any empties you own before we arrive. Our truck carries the empty bar, the furniture, and the glassware.

Does your crew pull the tap towers and the glycol unit?

That work belongs to a draft technician, who will drain and disconnect the lines, pull the towers and chiller, and reinstall and balance the system at the new bar. We schedule our carry after the draft work at the old bar and leave the back-bar wall clear for them at the new one.

Our brewhouse is moving to a new unit. Do you handle the tanks?

No. Fermenters, brite tanks, and the brewhouse go with the installer or equipment vendor, who brings the heavy equipment those vessels need. We move the taproom, the office, the merch, and loose brewery supplies around their schedule, staying out of the production floor while they work.

Our Jacksonville Beach bar loads from a shared alley. How do we keep it clear for the neighbors?

We plan loading for the hours the alley is quietest, usually late evening or early morning, and stage pieces inside your bar rather than in the lane. Tell us which neighbors use the alley for deliveries and when, and we’ll book the truck around them.

Plan your business move

Tell us both addresses, the building rules you know about, and the dates you cannot move. We will send back a written plan and estimate.

Call (904) 209-9277

Mon–Sun 8:00 AM – 7:00 PM

Call Now call 904-209-9277