Access and scheduling
We build the schedule around the electrician. If your benching has hardwired power, the electrician releases it before we start and restores it after the rebuild, so we agree both times with them first. Your IT contact disconnects data at the desks before breakdown and returns once desks are powered. We can run breakdown into the evening and rebuild on a Saturday, so staff leave on a working floor and come back to one.
Long bench runs take up space when they are apart. Frames, tops, and beams for a single row can fill a corridor, so we ask the building where parts may sit by the freight cab and for a dock slot long enough to load in rebuild order. The new floor must be clear of other trades before the first frame goes down.